1. Which of the
following is considered a major process flow structure?
·
Lead Time
·
Fabrication
·
Lean Manufacturing
·
Project
Find the final exam answers here OPS
571 Final Exam
2. ISO audits result in
certifications that are done by first, second, or third parties. Which of the
following result in the best certification of a firm?
·
Certification is sought
by any firm assuming they pay annual dues.
·
2nd Party – where a
customer audits its supplier
·
3rd Party – where a
qualified national or international standards/certifying agency serves as an
auditor
·
1st Party – where a firm
audits itself against ISO standards
3. Which of the
following is ISO 14000 primarily concerned with?
·
Quality management
·
Time management
·
Continuous improvement
management
·
Environmental management
4. Which is the one
correct value stream principle?
·
Look for efficiencies in
the factory, office, physical, procedural, and technical operations.
·
Eliminate waste that
stops, slows down, or diverts the value stream.
·
Concentrate on speeding
up value-adding operations rather than removing waste.
·
Keep the value stream
moving at minimum velocity.
Want
to download the Complete Assignment..?? Click OPS
571 Week 1 Quiz (Latest)
5. What is the starting
point in developing a capacity plan for a health care operation?
·
Determining the
effective capacity over time
·
Estimating design
capacity
·
Forecasting patient
demand for a reasonable length of time
·
Discovery of the
bottleneck operation
6. Which of the
following is considered an organizational blueprint, which prescribes the
quantity and time frame for when each end product will be assembled?
·
MRP (Material
Requirements Plan)
·
ERP (Enterprise Resource
Planning)
·
MPS (Master Production
Schedule)
·
WBS (Work Breakdown
Structure)
Download
Complete Answers OPS
571 Week 1 Complete
7. Which of the
following is an element that addresses elimination of waste under lean
production?
·
Kanban production
control system
·
Production ahead of
demand
·
Minimized run times
·
Group plant loading
technology
8. In most cases, demand
for products or services can be broken into several components. Which of the
following is considered a component of demand?
·
Level elements
·
Future elements
·
Past elements
·
Cyclical elements
9. Design for
manufacturing and assembly delivers product improvements by emphasizing which
of the following:
·
Reducing product quality
during the assembly process
·
Designing products so
they can be manufactured by a virtual factory
·
Reducing equipment in
the production process
·
Simplification of the
product by reducing the number of separate parts
Click here to download Complete Answers of OPS 571
10. Which of the
following is one of the principles of reengineering?
·
Quality at the source
·
Do not select suppliers
on the basis of price alone.
·
Have those who use the
output of a process perform the process.
·
Leverage high cost
employees with lower cost employees.
11. Which of the
following is a characteristic that can be used to guide the design of service
systems?
·
Services are all
similar.
·
Services businesses are
inherently entrepreneurial.
·
Quality work means
quality service.
·
Services cannot be
inventoried.
12. Considering Hau
Lee’s uncertainty framework for classifying supply chains, which of the
following is given to a supply chain which has an evolving supply process based
on functional products?
·
Risk hedging
·
Forward looking
·
Efficient
·
Agile
To
download the complete paper click OPS
571 Week 2 Quiz (Latest)
13. There are many
applications of poka-yokes in service organizations. Which of the following is
one of the three-T's used to classify poka-yokes?
·
Trust
·
Teamwork
·
Task
·
Time
14. Which of the
following is a major factor that distinguishes service design and development
from manufacturing design and development?
·
The service package has
the same legal protection available to manufactured goods.
·
Manufacturing is far
more capital intensive than services.
·
The service process and
service product can be developed independently.
·
The service package is
the major output of the development process.
To
download the complete answer check OPS
571 Week 2 Complete
15. A project can be
segmented into which of the following?
·
Events
·
Sub-jobs
·
Work packages
·
Success markers
16. Which of the
following is a cost impact and payoff analysis tool from the operations
consulting tool kit?
·
Statistical tools
·
Decision trees
·
Work sampling
·
Gap analysis
17. According to the
theory of constraints, which of the following can be a capacity-constrained
resource (CCR)?
·
Product design
·
Inoperable equipment
·
An employee
·
A customer
Quiz
Answers just a click away OPS
571 Week 3 Quiz (Latest)
18. The ability to
rapidly and inexpensively switch production from one product to another enables
which of the following:
·
Economies of shape
·
Economies of size
·
Economies of scale
·
Economies of scope
19. According to the
theory of constraints, which of the following financial measurements can be
used to measure the firm's ability to make money?
·
Operating expenses
·
Dividends
·
Sales
·
Return on
investment
Complete
Answers just a click away OPS
571 Week 3 Complete
20. Deming’s PDCA (plan,
do, check, and act) cycle underlies what inherent Six Sigma principle?
·
Continuous improvement
·
Control charting
·
Standard deviation
·
Project management
21. Which of the
following is usually included as an inventory holding cost?
·
Order placing
·
Quantity discounts
·
Breakage
·
Typing up an order
Want
help? Click to download OPS
571 Week 4 Quiz (Latest)
22. Which production
process term best describes the situation when activities in a stage of
production must stop because there is no work?
·
Blocking
·
Starving
·
Staging
·
Buffering
23. In a Gantt chart the
vertical axis represents which of the following?
·
Time
·
Revenue
·
Tasks
·
Cost
Click
here and download OPS
571 Week 4 Complete
24. The Shingo system
states that the way to prevent defects from coming out at the end of a process
is to do which of the following:
·
Redesign the process in
order to mitigate the bottlenecks.
·
Utilize SQC (statistical
quality control).
·
Introduce controls
within the process.
·
Slow down production
rates until the process is in control.
25. Which of the
following terms describes the time a unit spends actually being worked on
together with the time spent waiting in a queue?
·
Flow time
·
Build time
·
Cycle time
·
Run time
26. Which of the
following is one of Dr. Eli Goldratt's rules of production scheduling for
optimized production technology?
·
An hour saved at a
bottleneck operation does not increase the process flow.
·
If you lose an hour at a
bottleneck it is better than making scrap.
·
Do not allow bottlenecks
to govern the flow of the line.
·
Utilization and
activation of a resource are not the same.
27. During the
implementation of a project, which of the following should be the primary focus
of a consulting firm?
·
The correct project
software
·
Application of the
learning curve theory
·
Tools and materials
availability
·
People management skills
Download
for answers OPS
571 Week 5 Complete
28. Which of the
following is an analytical tool used in Six-Sigma quality improvement programs?
·
Gantt charts
·
Pareto charts
·
Tree charts
·
Pedigree charts
29. A project manager
must consider several components when overseeing the planning process of
aggregate operations; specifically, whether such components are factors that
are internal or external to the organization. Which of the following factors
would be classified as an internal component for an organization?
·
Inventory levels and
economic conditions
·
Market demand and
subcontractor capacity
·
Current physical
capacity and current workforce
·
Competitor behavior and
current workforce
Want
more details? Download now OPS
571 Week 6 Quiz (Latest)
30. Which of the
following is the net requirement using an MRP program if the gross requirement
is 10,000 and the inventory on hand is 4,000?
·
10,000
·
14,000
·
6,000
·
4,000
About
Author
This article covers the topic for the
University Of Phoenix OPS 571 Final Exam. The author is working in the field of education from last 5
years. This article covers the basic of OPS 571 Final Exam Assignment from UOP. Other topics in the class are as follows:
OPS 571 Week 1 DQ 1
OPS 571 Week 1 DQ 2
OPS 571 Week 1 DQ 3
OPS 571 Week 1 DQ 4
OPS 571 Week 1 Process Design Matrix and Summary
OPS 571 Week 1 Quiz (Latest)
OPS 571 Week 1 Complete
OPS 571 Week 2 DQ 1
OPS 571 Week 2 DQ 2
OPS 571 Week 2 DQ 3
OPS 571 Week 2 DQ 4
OPS 571 Week 2 Process Designs and Supply Chains
OPS 571 Week 2 Quiz (Latest)
OPS 571 Week 2 Complete
OPS 571 Week 3 DQ 1
OPS 571 Week 3 DQ 2
OPS 571 Week 3 DQ 3
OPS 571 Week 3 DQ 4
OPS 571 Week 3 DQ 5
OPS 571 Week 3 Process Designs and Supply Chains Part II
OPS 571 Week 3 Quiz (Latest)
OPS 571 Week 3 Complete
OPS 571 Week 4 DQ 1
OPS 571 Week 4 DQ 2
OPS 571 Week 4 DQ 3
OPS 571 Week 4 DQ 4
OPS 571 Week 4 Supply Chain Design Paper
OPS 571 Week 4 Quiz (Latest)
OPS 571 Week 4 Complete
OPS 571 Week 5 DQ 1
OPS 571 Week 5 DQ 2
OPS 571 Week 5 DQ 3
OPS 571 Week 5 DQ 4
OPS 571 Week 5 Project Management Recommendation
OPS 571 Week 5 Quiz (Latest)
OPS 571 Week 5 Complete
OPS 571 Week 6 DQ 1
OPS 571 Week 6 DQ 2
OPS 571 Week 6 DQ 3
OPS 571 Week 6 DQ 4
OPS 571 Week 6 Process Improvement Presentation
OPS 571 Week 6 Quiz (Latest)
OPS 571 Week 6 Complete
OPS 571 Final Exam (Latest)
Want to check other classes..?? Visit: www.studentehelp.com